Richmond Division Recollections

Introduction

Main Street Station, Charlottesville, Virginia -1970

My introduction to a railroad paycheck was during the summer of 1969. During junior and senior high school years, 1967-1968 at Alexandria (Virginia), I frequented Alexandria Union Station to meet Railway Post Office trains. The ticket sellers and baggage-mail porters became familiar and friendly to me. I had found a summer job during June, 1969, at Arrow Moving Company in the west end of Alexandria. It paid two dollars per hour, but only if you went out on a moving assignment. I was thin and immature, so the coordinator would look around the room of candidates and pick those who appeared more athletic. I did my share of moving refrigerators up three flights of stairs, but on many days I wasn’t assigned to a move by 11 a.m. after having arrived at the office by 7 a.m. On those days there was no pay and nothing to do except to go home and try again the following morning.

Read more

Saturdays and Sundays at NW Tower

A diesel coming to tie on and take the train to Brewster.

By the mid 1960s, my father was still working a “relief” job. This meant OW on Mondays, JO on Tuesday and Wednesday, and NW on Thursday and Friday. For several years the railroad was short on towermen, and my dad worked his days off at NW.  Saturday was my big day to go with him. My dad was always a good relief and came in early—most men were. Jim Donahue was the day man and was ready to leave after we showed up and he let my dad know if anything was not normal. That meant with the interlocking machine as well as trains not running in their normal order.

Read more

Tower Architecture

“CW Cabin” – Hinton, West Virginia – Chesapeake & Ohio – Robert Staples photo

Railroads today are very standardized in their operations and equipment. It is very difficult to distinguish one railroad from another other than by their paint scheme. Things were different in the golden age of railroading. The railroads were very different from each other in terms of operating practices, the equipment used to move freight, and even the structures used to support operations such as depots or interlocking towers.

I will cover just the general look and design that the railroads followed most of the time. Please keep in mind that there were always exceptions to the rules.

Each railroad’s towers had their distinctive look and most followed a standard design or plan, but even within the same railroad, the towers could differ in looks or style from line to line. Read more

Interlocking Towers
 A Lost World

bowie-md_web
Pennsylvania RR – Bowie Maryland – Photo by Ed Lenio

The interlocking tower, while not totally gone, has virtually vanished from the railroad scene. Whether it was a humble one story shanty or a magnificent two, three or more stories tall building, they once served a vital function. Some controlled where double track went to single; others controlled where two or more railroads crossed; others controlled a vast and complex passenger station “throat”.

Towers could be built to a particular railroad’s standard blueprint, but they all had their own personality. It was easy to recognize a certain railroad’s tower. Pennsy had it own look, as did the New York Central, Erie and the rest, but no hard and fast rules applied, even within the same railroad.

jd-md_web
Baltimore & Ohio – JD – Maryland – Photo by Gordon Bjoraker – May 1985
green-ct_web
New Haven RR – Greenwich, Connecticut – Photo by Tom Donahue – 1973
bo-mi_web
Michigan Central (NYC) – BO – Kalamazoo, Michigan – Photo by Trey Kunz
alexis-oh_web
New York Central – Alexis – Toledo, Ohio – Photo by Dan Maners – Feb 1989
clagg-ky_web
Pennsylvania RR – Clagg, Kentucky – Photo by Dan Maners – March 1988

The inside of an interlocking was a fascinating and magical place.

na-md_web
Baltimore & Ohio – NA – Baltimore, Maryland – photo by Bob Uhland

Watching the operator going about his duties was a sight to behold. There was always something going on; the constant chatter on the dispatchers line, the “ding” of the bell notifying that a train was “on the circuit “, or the operator transcribing a train order. The special smell of the grease used to lubricate the throw rods added to the ambiance.

ac-oh_web
Erie RR – AC – Marion Ohio inside – Photo by Dan Maners – Oct. 2002
cx-md_web
Baltimore & Ohio – CX – Maryland – Photo by Bob Uhland – November 1984

With the advent of CTC, radios, and more recently computers, it is now possible to control hundreds of miles with only one dispatcher. Downsizing the physical plant and outright abandoning of portions of the railroad helped hasten their demise.

cobb-in_web
Big Four (NYC) – Cobb – Coal Buff Indiana – Photo by Bob McCord – 1965
carleton-mi_web
Chesapeake & Ohio – Carleton, Michigan – Photo by Trey Kunz – 23 May 2001
haley-in_web
Chicago & Eastern Illinois RR – Haley – Terre Haute, Indiana –  Photo by Rich Hafer – September 1999

Dan ManersText Copyright 2016
Photographs Copyright 2016 by the photographer credited in the photo captions.
See more of Dan’s work at his website: North American Interlockings.

Maine Central Remembered

January, 1968
bar-nome-jct-1226
“Tower MD’s building housed the CTC machine, relays and electronic equipment, a robust heating system, the operator, and a cat.”

When passenger service on the Maine Central Railroad (MEC) ended in 1960, I was 15 years old and had never been to the State of Maine. After the passenger trains were gone, the freight business was alive and well, thanks to the smart investments and wise business management of E. Spencer Miller, President of the railroad from 1952 through 1975.

My introduction to Maine was in 1964 through Colby College, which together with the railroad, was a major presence in Waterville, where the Maine Central had its repair shops, and its largest and most important classification yard.

Excursions beyond Waterville served as a diversion and study break from grinding through textbooks in the college library, and presented the chance to learn more about the railroad and how it worked.

One bitterly cold January day, a trip to explore the eastern portions of the Maine Central seemed like a good idea. I headed up toward Northern Maine Junction, where the MEC interchanged cars of Maine products, including printing paper, pulpwood, and potatoes, with the Bangor and Aroostook Railroad.

Around 1957, the Maine Central was still very much investing in the railroad, and a new CTC installation between Pittsfield and Northern Maine Junction was authorized to realize savings in redundant trackage and improve efficiency in the operation. The upgrade eliminated double track, and replaced the automatic block signals with a modern centralized traffic control system.

Tower MD’s building housed the CTC machine, relays and electronic equipment, a robust heating system, the operator, and a cat. On this winter day, I’m sure Phil Butler, the tower operator,  was not expecting any weekend visitors to his lonely outpost, but he was most cordial and welcoming. I think he appreciated anyone who was interested in what he did and how he did it. After some railroad small talk, he explained the machine and how it worked. Tower MD was also a train order office, and so the order hoops and train order signal over the building were part of the station’s equipment.

To me, these photos are a time capsule of the Maine Central in good times. Trains were run at speed on well maintained track, most of the time with “High Green” Clear signals displayed.

After the boom years of the 1970’s, a combination of business and economic factors brought the Maine Central to its knees. Wall Street raiders took over the debt free railroad, precipitating a long and bitter strike of the Maine Central’s loyal and hardworking employees.  Hundreds of track miles which had served the state’s industries for one hundred years and more were either abandoned or no longer maintained.

Today the CTC is gone. Most of track has a speed limit of 10mph, and many of the paper mills have closed as their product has become unneeded in the internet world.

It has been hard to watch the decline, but I certainly have many wonderful memories of what main line railroading was like Down East, back on that bitter cold winter afternoon.

bar-nome-jct-1225
Tower MD – Northern Maine Junction

Bob Hughes – Photographs and text Copyright 2016